EnBW - High-pressure-meter testing facility, 2012
Hochdruckzählerprüfstand
Contractor: Stroetmann Hinz, Wolfer & Goebel
Scope: Detailed Design
Through the liberalisation of the gas-supplier market the pipeline operation and gas suppliers shall become separate businesses. By this all market participants can access the pipline network. Which creates a high demand for high-precision gas-meters in the high-pressure segment. To statisfy this demand the EnBW built close to the gas tank in Stuttgart a testing facility for high-pressure gas-meters.
We did the detailed design for the general contractor Wolfer&Goebel.
Gross floor area: ca. 1.700 m²
Construction cost: ca. 2 mio Euro