ThyssenKrupp Elevators, 2013
Contractor: Stroetmann Hinz
Scope: from conceptual to tendering
The production site of ThyssenKrupp elevators is to be renovated and extended.
We were contracted as general planers, including architecture, engineering and building equipment.
The project consists of several subprojects which are in different phases of realisation, from conceptual design to operating state.
Gross floor area: ca. 59.000 m²
Construction cost: ca. 30 mio Euro